Home Sidewalk Grant Non-Construction Costs Sidewalk Grant Non-Construction Costs In the interest of transparency, below are the non-construction costs ($60,524 total) that the ACRPC and Dubois & King have presented the City of Vergennes for a 400 Foot Sidewalk: ACRPC Dubois & King Non-construction costs typically comprise 20% of the total project.